|
Glow Networks, Inc. /
Alcatel-Lucent USA, Inc.Richardson, TX
4/2013 – 10/2015Network Design
Engineer Plano, TX
LTE & UMTS Network Integration, ATM Support for
MSN / RSP New Site Builds Provisioning
v AT&T LTE
eNodeB Design Engineer creating eUTRAN workorders for AT&T New Site
Build Projects.
v AT&T LTE &
UMTS IP Transport Engineer supporting transport provisioning, integration
and troubleshooting.
v Alcatel-Lucent ATM
Support for MSN/RSP provisioning on AT&T’s RNC reparenting activities.
Perform Tellabs 8600 MSN/ ALU 7670 RSP integration, reconfiguration &
troubleshooting for Alcatel-Lucent NodeB eqpts.
v ALU Design support
for GSMoE project configuring 7705 SIAD, 7750 IP-MSN and 7750 SR-12 TDM-MSN
v ALU ATM/IP Support
for MSN/RSP provisioning, integration and troubleshooting on AT&T New
Site Build Projects.
v ALU ATM Support
for R2A, R2B, R2C and SIAD integration/migration and AT&T’s RNC rehome
/ reparenting activities with ALU 7750, 7705, 7670 and Tellabs MSN 8600 and
SIAD 8605 equipments.
Verveba Telecom Richardson,
TX
6/2013 – 1/2014Lead RF Design Engineer
Austin, TX
Austin ALU WiFi RF Design for Time Warner Cable
v Represent ALU as
Lead RF Designer for Time Warner Cable’s nationwide deployment of WiFi
coverage using Ruckus ZoneFlex WiFi equipments.
v Produce and
provide designs to meet monthly goal of 150 Access Points for TWC approval
and implementations.
v Completed,
successfully implemented and exceeded the target number of 1000 APs for
2013 TWC WiFi rollout.
v Transitioned to
ALU RF Project Manager for RF Drive Testing covering markets of Kansas, St.
Louis, Minneapolis, Detroit, Ohio, Philadelphia and WABA.
Avion Systems, Inc. /
Alcatel-Lucent USA, Inc.Atlanta, GA
11/2010 – 4/2013Network Design
Engineer Plano, TX
UMTS Network Integration, ATM Support for MSN / RSP
New Site Builds Provisioning
v Alcatel-Lucent ATM
Support for MSN/RSP provisioning on AT&T’s RNC reparenting activities.
Perform Tellabs 8600 MSN/ ALU 7670 RSP integration & troubleshooting
for Alcatel-Lucent NodeB eqpts.
v ALU ATM Support
for MSN/RSP provisioning, integration and troubleshooting on AT&T New
Site Build Projects.
v ALU ATM Support
for R2A, R2B, R2C and R4B SIAD integration/migration and AT&T’s RNC
rehome / reparenting activities with ALU 7750, 7705, 7670 and Tellabs MSN
8600 and SIAD 8605 equipments.
v ALU Support for
GSMoE project configuring 7705 SIAD, 7750 IP-MSN and 7750 SR-12 TDM-MSN
v GTA Teleguam ATM
Support for Guam Market’s RSP/ESE provisioning & NodeB Integrations.
Mycom North America, Inc.Atlanta, GA
12/2009 – 11/2010NSS Engineer IIRichardson,
TX
MSN / RNC / NodeB / DACS and Granite Design for
AT&T UMTS Projects
v MSN Engineer –
perform MSN/NodeB T1 verification tests, integration and troubleshooting;
also do MSN provisioning for new site builds for both Ericsson &
Alcatel-Lucent equipments. Also perform Ericsson 3G ETTCS/IPBH Pre-Config
& RBS Migration from ATM to IP for AT&T Project. Equipments used:
Tellabs 8600, ALU 7670 NE, ALU 5620 NM, Citrix UNIX and Metaframe to access
Ericsson RNCs and NodeBS.
v Granite Design Engineer
– builds and designs Tellabs, Cisco, Nokia, Ericsson, Alcatel-Lucent
equipments, etc. in Granite, loading cards, cables and paths for new &
expansion equipment of AT&T UMTS(3G) & LTE(4G) network.
v DACS/DCS Test
Engineer – perform DCS/DXC testing in Alcatel DACS 1631 & 1671 &
Tellabs 5500 using NetAnalyst, creating VT1/T1 cross-connects and provides
support for end-to-end T1 troubleshooting with the field
Technician/Engineers.
Parsons Telecom, LLCRichardson, TX
03/2009 – 12/2009UMTS WCDMA RBS
Project Lead & Lead Tester IVEl Paso, TX
Ericsson UMTS WCDMA for T-Mobile Project
v UMTS Project Field
Manager – provides daily work schedule to RBS Field Installers/Testers and
Civil construction teams and participating in daily meetings with Ericsson
and T-Mobile PMs.
v Construction
Supervisor – functioned as UMTS Field Tester & t’shooter and supervised
General Contractor’s site construction and civil works prior to and/or
after NodeB equipment deployment.
v 3G/UMTS RF
Optimization Support – remained as Project Lead and at the same time
perform RF Optimization support and Operations & Maintenance support
while waiting for the Phase 3 project.
10/2007 – 03/2009 UMTS WCDMA RBS
Project Lead IVBay Area, SF, CA
Ericsson UMTS WCDMA for T-Mobile Project
v UMTS
Project Lead - supervising about 32 RBS Field Installers & Testers,
providing daily work schedule, coordinating & attending meetings with
Ericsson PMs and tracking down daily reports.
v O&M and Transport
Support – troubleshooting NodeB alarm issues, T1 connectivity & LMC,
RNC Scripts configuration mismatch and P6 SW upgrades.
03/2007 – 10/2007 UMTS WCDMA RBS Lead
Tester IVLA & Bay Area, CA
Ericsson UMTS WCDMA for AT&T Project and T-Mobile
Special Project
v Lead
Tester/Support Team – Field Lead troubleshooter for AT&T Ericsson UMTS
Project in LA support the Team as BSC/RNC Switch Tester field support
v Special Project
Support – technical support for Ericsson Special Project in Bay Area responsible
for T-Mobile Concord UMTS Training Networks’ installation, commissioning,
integration, drive tests and RF Engineering Field Optimization support.
Also assigned to work with RNC Team and perform RNC configurations and
script troubleshooting for both RNC & NodeB UTRAN elements.
07/2006 – 02/2007 UMTS WCDMA RBS
Project Lead Sacramento, SF, CA
Ericsson UMTS WCDMA for AT&T Project
v UMTS Project Lead
– supervising about 20 RBS Field Installers & Testers, providing daily
work schedule, coordinating & attending meetings with Ericsson PMs and
tracking down daily reports.
v O&M and RF
Support – perform NodeB troubleshooting & alarm-clearing on and off
whenever we were short of resources and support Field Testers and RF Team
for extensive fault-finding.
02/2005 – 07/2006 GSM RBS Project Lead
Los Angeles, CA
Ericsson GSM for Cingular’s Nokia-Ericsson Change-out
Project
v O&M Project
Lead – Operations & Maintenance support for Los Angeles Cingular Market
in 3 districts assigned to Parsons during the Nokia-Ericsson change-out
project.
v District Project
Lead – District 2 Project Lead for Cingular’s Nokia/Ericsson GSM/2G
Change-out responsible for simultaneous supervision of O&M Team.
v BSC Switch Tester
– provided BSC support for field O&M Team and RF Team’s field
troubleshooting doing remote tests on the BTS monitored by the Field
Technicians/Engineers.
v Nokia Support Lead
– assigned as Lead to provide supports for Ericsson & Cingular District
Leads on Nokia TMA Change-out prior to cutover Night.
v RF Optimization
Support – assigned as RF Technical Support for Nokia to Ericsson TMA
migration preparing/performing link budget analysis during and after the
preliminary tests & evaluation of Nokia/ Ericsson TMA change-out.
03/2004 – 02/2005 GSM RBS Lead
Installer/Tester IVWashington & Baltimore, MD
Nokia GSM/2G for Cingular Site Expansion
Project
v RBS Field Lead
Installer & Tester – performed installation, commissioning,
integration, t’shooting and call path tracing of Nokia GSM/2G BTS equipment
(Ultrasite & Metrosite) site expansions.
Dataworkforce, LP Frisco, TX
01/2003 – 03/2004Telecom System
EngineerIndianapolis, IN
Ericsson GSM O&M Support for Cingular Network
v Lead O&M
Support – Operations & Maintenance support for Cingular’s GSM Cellular
Network in Indiana State doing RBS field 2nd line maintenance
& troubleshooting with Ericsson ITAC.
v BSC Switch Tester
– provided support for field testers in RBS Site troubleshooting & RF
Optimization doing remote test in the BSC end-to-end with the Field
technicians/engineers.
v RF Optimization
Support – assigned as Lead for Tiger Team to provide Ericsson’s RF Team
field support supervising 10 Testers/Troubleshooters to provide RF fine
tuning & fault-finding.
11/2002 – 01/2003Telecom System
EngineerAustin, TX
Ericsson EDGE-GSM for AT&T Project
v RBS Lead Installer
and Tester – installation and test of Ericsson EDGE-GSM equipments and PCN
upgrades and troubleshooting of GSM RBS Sites.
07/2002 – 10/2002Telecom System
EngineerCharleston, SC
Ericsson GSM/2G for Triton South Project
v RBS Lead Installer
and Tester – assigned as Lead installer and tester for Triton South’s
Ericsson GSM/2G Project - BTS Sites CMS 40/RBS 2206, 2106 & 2102;
completed more than 130 GSM sites for Suncom.
v RBS Lead Tester-
performed BTS site integration, TDMA-GSM Cutover and pre/post drive testing
and troubleshooting for the new & converted sites.
Global Electro-Comm. Intl., Inc.Dallas, TX
09/2001 – 07/2002Telecom System
EngineerDallas & DFW Area, TX
Ericsson GSM for AT&T Project
v RBS Lead Installer
and Tester – assigned as Field Lead Tester responsible for installation,
test, integration and call tests of AT&T’s first Ericsson GSM/2G BTS
Sites - CMS 40/RBS 2206, 2106 and 2302.
v Tiger Team Lead –
later assigned to support RF Optimization, BTS 2nd line
troubleshooting and Operations & Maintenance to minimize outages before
and after AT&T GSM Launching.
CST Services, Inc.Plano, TX
02/00 – 05/01Telecom System EngineerDallas
& DFW Area, TX
Ericsson TDMA for AT&T Project
v RBS Installer and
Tester - installation, expansion/channel adds, integration and
troubleshooting of Ericsson TDMA equipments, viz., RBS 882, RBS 884(Macro
& Micro Sites) and 882 Cassette.
v MSC/BSC Switch
Tester - writing, running & troubleshooting Data Translations (DTs),
integrations and call tests. Also covers re-configuration of CSU, DSU,
T-Coders, Telco equipment and Microwave equipments.
Smart Communications, Inc.Makati City,
Philippines
03/1996 – 06/1999RBS Telecom EngineerNationwide
assignments, Philippines
RBS Installation, Commissioning & Test Engineer,
O & M Support & RF Optimization
v RBS Installer and
Tester – installation, commissioning & integration of Ericsson RBS
TACS/D-AMPS Cellular Telephone equipments, viz., RBS 882, RBS 883, RBS
883M, RBS 884 & RBS 889.
v RBS Installer and
Tester – installation, commissioning, integration & troubleshooting of
Nokia’s GSM Cellular RBS with Dual-band Technology i.e., Nokia’s
DE-34/DF-34 or GSM 900/GSM 1800.
v Lead O&M and
RF Support - supports Operations and Maintenance and RF Team for
optimization and service quality tests & corrections
|